Unit – 2 - WORK STUDY, METHOD STUDY AND
WORK MEASUREMENT
Note : 1. Highlighted Questions are asked more than two times
2. These questions are collected from last three years board examination question papers
2 marks / 3 marks.
1. What are the methods of increasing Productivity?
·
By improving working
conditions
·
By improving working
methods
·
By reducing non
productive time.
2. Define Method study
The
systematic recording & critical examination of existing & proposed ways
of doing work
3. Name the allowance which is not used for calculating
standard time.
·
Policy
allowance is not used for calculating standard time
·
This
allowance is given to increase the worker earnings
4. Define Empoyee Rating factor.
Rating
facor is the assesment of the rate of working operator by the work study man.
the work study man apply this rating based on his idea of standard performance.
5. Define Productivity
The
ratio of output produced (finished producr) to the input resources (raw material)
is called productivity
6. What is PMTS?
PMTS means Pre
determined Motion Time System, used to build up standard time for manual work.
7. Explain briefly about string diagram.
string diagram is
used to find out the total movement of a worker from one work center to other
8. Describe the procedure in making a time study.
·
Select the work
·
Obtain and record all the information about the
job, the operator and the working conditions
·
Breaking down the operation into elements
·
Measure the time by means of a stop watch taken
by the operator
·
Assesing the rating factor
·
Calculate the basic time
·
Determining the allowances
·
Compiling the standard time
9. Write any two objectives of work study.
·
Improving the plant
layout
·
To Provide better
working conditions
·
To find the ways of
increasing productivity
10. Explain with Block Diagram how standard time is
calculated.
O.T |
R.F |
R.A |
P.R.A |
CA |
P.A |
O.T. observed time R.F.
Rating Factor R.A - Rating allowances
P.R.A – Process Allowances C.A – Contingency Allowance
P.A – personal allowances
11. Define allowances
The extra time added to
the basic time to compensate the work interruption, this extra time given to
adjust the work interruption is called allowances
12. Define Productivity and Standard of living.
The ratio of output
produced (finished producr) to the input resources (raw material) is called productivity
The extent to which a
man is able to spend for living a comfortable life with his family is called
standard of living
13. What is meant by policy allowance?
- Policy allowance is fixed by the management
- Policy allowance is not used for calculating standard time
- This allowance is given to increase the worker earnings
14. State the objectives of Method study.
- To improve the manufacturing process & procedures
- To improve working conditions
- To reduce material handling.