Diploma Mechanical Engineering | I.E.M | Unit - 2 Important Questions Based on Previous year question paper.

 Unit – 2 - WORK STUDY, METHOD STUDY AND WORK MEASUREMENT

Note : 1. Highlighted Questions are asked more than two times

           2. These questions are collected from last three years board examination question papers

2 marks / 3 marks.

  1. What are the methods of increasing Productivity?
  2. Define Method study
  3. Name the allowance which is not used for calculating standard time.
  4. Define Employee Rating factor.
  5. Define Productivity
  6. What is PMTS?
  7. Explain briefly about string diagram,
  8. Describe the procedure in making a time study.
  9. Write any two objectives of work study.
  10. Draw the symbols used for representing temporary storage & storage in process   charts
  11. Explain with Block Diagram how standard time is calculated.
  12. Define allowances
  13. Define Productivity and Standard of living.
  14. What is meant by policy allowance?
  15. State the objectives of Method study 

10 marks

  1. Explain Man- Machine Chart.
  2. Write down the different allowances used in calculating standard time and explain.      
  3. Explain Two handed process chart with a neat sketch.
  4. Write Short notes on (i) analytical estimating (ii) synthesis from standard data.                                                 (iii) Ratio – Delay study.
  5. What are the various means by which productivity can be increased? Briefly explain each.
  6. Write short notes on (i) Analytical Estimating (ii) Employees Rating Factor
  7. Explain in Detail the steps involved in time study
  8. With a block diagram, Explain how the standard time for a job is determined
  9. Explain the basic procedure of method study
  10. Expalin Various allowances applied to stop watch time study.